HIGH TIDE MITIGATION

BEFORE THANKSGIVING

We will place water-filled barricades across the boat launch and between the bay and the east restrooms. Tarps and sandbags will be used to prevent water from seeping through the gaps. This should help channelize water away from the temporary road and the restroom.

AFTER THANKSGIVING

We have placed the order for 1,500 feet of lay-flat pipe for use a high tide barricade along the trail. The pipe material will be delivered as soon as next Tuesday, Nov 27. Once received, the install can happen within a day’s work.