top of page
N2
PHASE NOTES
AMENITIES
TEST FITS

An Attractive Force

GRAVITATE

Phase 2 of Kilroy Oyster Point

DESIGNED FOR WHAT'S NEXT
Phase 2 represents the continued evolution of Kilroy Oyster Point, a waterfront campus where world-class science, thoughtful amenities, and a connected community come together to support discovery at every scale.
200311_KOP_Gravitate.png
200311_KOP_Gravitate_Building Icon.png

~ 865,000 sq. ft

3 Buildings

7-8 Stories

200311_KOP_Gravitate_Floor Plate Icon.pn

~ 40,000 sq. ft.

Large, Open Floor Plates

200311_KOP_Gravitate_LBS Icon.png

125 LBS / SF

Significant Floor Load Capacity

200311_KOP_Gravitate_ColumnSpacing Icon.

22' x 33'

Typical Column Spacing

200311_KOP_Gravitate_LEED Icon.png

LEED

Gold

Target 

200311_KOP_Gravitate_Height Icon.png

16' HEIGHT

Typical Floor-to-Floor Height

200311_KOP_Gravitate_LabOffice Icon.png

70:30

Lab/Office Life Science Warm Up

200311_KOP_Gravitate_Parking Icon.png

2.5 / 1,000

Parking Ratio

At the heart of Phase 2, a thoughtfully curated collection of amenities creates opportunities to connect, collaborate, and recharge throughout the day. An open-air amphitheater, flexible outdoor gathering spaces, a fully equipped conference center, and a vibrant food & beverage destination come together to support both productivity and community across the campus.

click  "+"  to explore the campus

Kilroy Oyster Point_Phase 2

EXPLORE OPPORTUNITIES AT KILROY OYSTER POINT

Connect with our brokerage team to learn more or schedule a campus tour.

Toss Vallentine

650.480.2133

LIC #01742629

toss.vallentine@am.jll.com

Scott W. Miller

650.480.2199

LIC #01457617

scottw.miller@am.jll.com

Mark Bodie

650.480.2212

LIC #01941415

mark.bodie@am.jll.com

Grant Yeatman

510.465.9406

LIC #01972905

grant.yeatman@am.jll.com

Cole Smith

650.480.2230

LIC #01948128

cole.smith@am.jll.com

JLL_color.png
bottom of page